High School

Security Entrance

 
School safety and security is on the frontlines nationally due to unfortunate tragedies that have cost lives of students and staff around the nation. An area of focus for the district is ensuring buildings are safe and secure for students, staff, and the community. Security best practices have evolved over time and there is a need to make changes to the entrance at the high school to maximize student and staff safety.
Project Completed July 2017

Twelve Additional Classrooms

The high school opened in 2009 with a capacity of 2000 students. An additional twelve (12) classrooms will add space for an additional 360 students. According to a July 2016 demographic study, the high school will enroll approximately 2,000 students in 2017-2018 with growth projected to be 2282 students by 2020-2021. An additional twelve classrooms will increase the capacity of the high school to 2360. Six of the twelve classrooms will be built on the North side of the building on the third floor. The other six classrooms will be built on the West side and be a three story addition.

Click here for the STMA High School Classroom Additions

Click here for the site plans for the High School.

Click here to view bids for the High School Classroom Additions

Construction Date: September 2017 to August 2018

Status Update (as of January 8, 2018):

  • Steel scheduled to start the week of January 22

See below for a brief description of the soil correction that was completed on both the Ice Arena and All-Purpose Facility.

Soil borings indicated that fill had been placed previously, and there was no record of compaction of the fill at the time it was placed. This is considered “uncontrolled fill.” In order to ensure that the facilities do not experience unexpected settlement, the fill that had previously been placed was re-excavated and put back in place with proper compaction methods and then tested. There was not any “contaminated soil.” There were some areas that had buried soils with high organic content (topsoil). These organic soils were removed from the site and replaced with imported material that meets the specifications for fill material.